In a new construction project, plumbing has three phases. The first phase is called the rough-in. The sch. 40 PVC sewer pipes shown here are run before the slab is poured and after the house is formed.

To ensure that the Louisiana State Plumbing Code is followed, each of the three phases is inspected by a local plumbing inspector. A tub box is the black plastic box with the pipe through it, on the left side. These boxes are located only at the tub and shower drains. These boxes are filled with sand prior to pouring the slab.

It gives space to work on when connected with either the tub or shower drain. Call Mock Plumbing now for an estimate!